Specialist Flooring Repairs and Screed Replacement at NHS Hospital
Zenith was appointed to replace failed screed across a series of inspection covers positioned over a major service duct within an NHS hospital.
NHS Hospital
Replacement of Screed to Service Duct Covers
£32,500
KDR Polybulk & Polyscreed
September 2026
4 weeks
Client Requirements
Located within one of the hospital’s main thoroughfares, the area is in constant use by catering teams, deliveries and other essential hospital services. Maintaining access throughout the works was therefore a key consideration.
The existing covers featured a mixture of concrete and polyurethane screed finishes, with several having deteriorated and failed. A durable replacement was required that could withstand the demands of this heavily trafficked environment while allowing the service covers to remain fully accessible.
Overview of Work
Each failed cover was carefully released by removing the retaining fixings positioned in each corner. These were temporarily replaced with threaded lifting eyes, allowing the heavy covers to be safely lifted and removed for refurbishment.
Once a cover had been removed, the exposed service duct was temporarily protected using 36mm marine plywood. This allowed traffic to continue through the area and helped minimise disruption to day-to-day hospital operations while the refurbishment work was completed.
The failed screed was then broken out from each duct cover to expose the underlying metal tray. Following preparation, a primer coat and reinforcing mesh were introduced before the covers were rebuilt using KDR Polybulk polyurethane bulk screed.
A final 6mm polyurethane screed wearing surface was then installed using KDR Polyscreed, creating an overall build-up of approximately 70mm.
Once fully cured to a hard finish, each refurbished duct cover was returned to its original position and securely refitted using new screws.
Features & Benefits
- Removal of failed screed: Allowed deterioratedmaterial to be completely replaced
- Temporary marine plywood covers: Maintainedaccess through the busy hospital thoroughfare
- Reinforcing mesh: Added reinforcement to therebuilt flooring system
- Polyurethane bulk screed: Rebuilt thesubstantial depth required within each metal tray
- 6mm polyurethane wearing surface: Provideda durable finish for a heavily trafficked environment
- Individual cover refurbishment: Allowed essentialservice duct access to be retained
- New retaining screws: Ensured refurbished coverswere securely returned to position
The Result
The completed works provided the hospital with renewed, hard-wearing service duct covers capable of meeting the demands of one of the site’s busiest thoroughfares.
Careful phasing and the use of temporary marine plywood covers allowed essential hospital traffic to continue throughout the four-week programme, minimising disruption while the failed flooring was systematically replaced.
The works demonstrate Zenith’s ability to deliver specialist flooring repairs in sensitive, continuously operational healthcare environments.